Hongwen high school Appearance photo

01 - Eagle rack erection

02 - The original paint layer to remove the operation

03 - Steel structure construction lofting, wash hole to complete

04 - Foundation excavation completed

05 - New base bar planting operations

06 - New base bar reinforced bandage

07 - New base seat grouting before the nail mold

08 - C steel positioning installation

09 - Wall assembly operation

10 - Wall assembly operation

11 - Base seat grouting is completed

12 -Beam steel plate reinforcement operations

13 - EPOXY perfusion seal

14 - Base without shrinkage cement infusion

15 - C steel plate

16 - Seismic wall group painting operation

17 - Seismic wall group painting operation

18 - original decoration decoration surface recovery operations

19 - Shear wall group finished photo

20 - Shear wall group finished photo